The lower level now has a new concrete floor, new I-beams that run the length of the building and adjustable supports. New floor joists
were sistered-in and I have been assured I could have River Dance on the main level and it wouldn't hurt anything.
Both staircases were also rebuilt.
Windows have been repaired, re-caulked and painted.
No comments:
Post a Comment